Back

Route information

Key information

Wemyss Bay - Rothesay

Winter timetables 2026/2027:

Winter timetables 19 October 2026 - 25 March 2027 The winter timetable for this route, for the period 19 October 2026 - 25 March 2027 is available to view and/or download in the timetables tab on this page and advance purchase of tickets is available.

If you’re travelling on a Wednesday, please note that the winter 2026/2027 timetable includes fewer afternoon sailings to allow for planned vessel maintenance. Please check the sailing times above before you travel.

Summer timetable 2027 The summer 2027 timetable will run from 26 March to 17 October 2027. We will update customers via our website once we have a release date confirmed.

Key Information:

Service status: Always check our service status pages for the latest information on this route.

Tickets: Advance purchase your ticket online, before you travel. Read our helpful guide on ticket validity.

Check-in: 20 minutes prior to departure for vehicles and 10 minutes for foot passengers. Late check-in may result in your vehicle being refused carriage.

Alternative route to/from Bute: there is an alternative route to Bute, travelling between Colintraive - Rhubodach.

Before you travel: Read our passenger travel checklist to prepare for your journey.

Guidance

  • CheckSMS subscriptions Wemyss Bay - Rothesay - Text code 03 Stay updated
  • CheckFood and drink - MV Argyle and MV Bute menu
  • CheckTrain connections are not guaranteed as some trains arrive/depart with less than the necessary transfer time. Please visit ScotRail's website for the latest info before travelling. ScotRail

Port and vessel facilities